Golfclub München-Riedhof

The Golf Riedhof GmbH & Co. Träger- und Betriebs KG decided, after finishing the upgrade of its practice grounds, to keep on improving its 18-hole Golfcourse. The existing ponds on holes 2 & 3 will be relieved from their siltation, made more visible and brought more into play. To still provide a fair entrance into green 2, one of the 4 green-bunkers will be closed. The two lakes on hole 4 will be joint with the construction of a new bridge. The lake on the righthand side will be enlarged and made more visible. Himmel Golf Design was assigned with the design.

Riedhof_Teich_02_Konzept_Planung_11.01.2019

Riedhof_Teich_03_Konzept_Planung_11.01.2019